In connection with a sharp deterioration in the turnover of wagons on the railway network and unproductive downtime due to the lagging of wagons from the movement, «Astyk Trans» JSC informs about the full load of applications for the entire available fleet for December 2021.
New applications for transportation are accepted for January 2022.
The company may resume accepting applications for December 2021 if the situation with the turnover of wagons normalizes and the applications already accepted for this month are fulfilled.